Activity Search: T19RW01163
Activity
Parcel Attributes
| Parcel | 140300350 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | MU |
| Tucson Ward | Ward 5 |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Permits
Date - 08/17/2026 7:13 a.m.
Number Of Permits - (1)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T19RW01163 | Final | 03/05/2019 | 04/10/2019 | ROW | 1. POTHOLING ON WEST AND EAST SHOULDERS AND IN MEDIAN OF ALVERNON WAY. 2. INSTALLATION OF 2 DIRECTIONAL BORES ACROSS ALVERNON WAY CONTAINING 2 - 2" COX AND 2 - 2.5" TEP CONDUITS FOR AERIAL TO UNDERGROUND CONVERSION REQUIRED FOR CANTERA SUBDIVISION. WORK INCLUDES SETTING A J1 CABINET FOUNDATION ON THE WEST SIDE OF ALVERNON WAY. 3. INSTALLATION OF A SINGLE 6" PRIMARY ELECTRIC TEP CONDUIT ON THE EAST SIDE OF ALVERNON WAY (BACK OF CURB). 4. INSTALLATION OF A SINGLE 4" LATERAL CONDUIT FOR CENTURYLINK ON THE EAST SHOULDER OF ALVERNON WAY (BACK OF CURB). NOTE: WHEN TRAVEL LANES ON ALVERNON ARE AFFECTED, THE WORK HOURS ARE 9A - 3:30P. WORK HOURS FOR SHOULDER WORK NOT AFFECTING TRAVEL LANES ARE 7A - 3:30P. |