Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Activity Search: T18RW02251
Activity
Parcel Attributes
| Parcel | 10319002H |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Wash |
| City of Tucson Zoning | SR |
| Tucson Ward | Ward 1 |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Permits
Date - 12/07/2025 6:57 a.m.
Number Of Permits - (1)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T18RW02251 | Final | 05/15/2018 | 11/14/2019 | ROW | Borderland will begin work on Silverbell Crossing a new subdivision on the east side of Silverbell. We will be tying in to an existing 12" line on the west of Silverbell Rd. We will be removing and replacing 36' of pavement. NOTE: AS SILVERBELL RD IS UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2" MILL AND OVERLAY FOR 50' IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL AFFECTED TRAVEL LANES NOTE: ADDRESS ON PERMIT IS FOR PERMITTTING PURPOSES ONLY - THE WORK IS ON SILVERBELL RD, APPROX 825 FT SOUTH OF PLACITA SOMBRA CHULA WORKING HOURS ALLOWED 7:00AM - 3:30 PM. 08/21/18 - PLAN ADD/CHANGE INSTALL ADDITIONAL 6" WATER LINE AND TIEING INTO EXISTING 12" WATER MAIN IN SILVERBELL ROAD. REMOVE AND REPLACE 30 LF OF PAVEMENT (THIS IS A SECOND CROSSING). 05/17/2019-PLAN CHANGE Borderland will begin work on Silverbell Crossing a new subdivision on the east side of Silverbell we will be tying in to an existing 12” line On the west of Silverbell Road we will be removing and replacing 36’ of pavement. NOTE: As Silverbell Road is under a pavement moratorium any new asphalt that is disturbed will require a 2“ mill and overly or 50' in each direction from the outside of the cut or all affected travel lanes. NOTE: Address on permit is for permitting purposes only, the work is on Silverbell Rd. Approx 825 ft South of Placita Sombra Chula Working hours allowed 7am-3:30pm 8/21/18 plan add/change Install additional 6" water line and tieing into existing 12" water main in Silverbell road, remove and replace 30LF of pavement (this is the second crossing) |