Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Activity

 

Permits

Date - 11/21/2024 11:54 p.m.
Number Of Permits - (1)
Permit Status Apply Date Expired Date Unit Type Description
T13EX01065 Closed 10/03/2013 04/01/2014 EXCAV For the installation, back-filling, grading from property line to property line, and all clean-up necessary to install those improvements as shown on city of Tucson approved Plan No. I-2009-031 (all in accordance with Pima County/City of Tucson Standards and Specifications and details). Construction inspection will be performed by the City of Tucson Department of Transportation in accordance with City of Tucson standard and specifications. Any required special inspections shall be performed by the developer's engineer of record. The developer/contractor shall be responsible for the backfill of all wet and dry utility trenches per Pima County/City of Tucson Standards and Specifications for Public Improvements. Compaction and material testing reports and construction surveillance notes pertaining to the backfilling of the utility trenches must be submitted to the City of Tucson DOT Permit and Codes Section for review prior to the start of roadway subgrade preparation work. THIS PERMIT MUST BE RENEWED EVERY 180 DAYS TO REMAIN VALID.