Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Activity Search: T09SA00245
Activity
Special Development Requests & Requirements
Date - 12/11/2025 3:42 a.m.
Total Number Of Special Development Permits - (1)
| Activity Number | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T09SA00245 | Approved | N/A | Setback & Height DDO | DDO-09-69 ANDREE: NEW GARAGE ADDITION/2ND DWELLING DDO REQUEST: 1. To allow the new garage addition be constructed with a reduced rear yard setback of (8'-8") to the south lot line of the property; 2. To allow the new garage addition be constructed with a reduced side yard setback of (0'-0") to the east lot line of the property, and Land Use Code (zoning) regulations require a minimum setback of six (6') or 2/3 the height of the exterior building wall be provided between any part of the existing garage/two story 2nd dwelling expansion and the property's south lot line. Based on a (19'0") exterior building wall the required setback is (12'-8"). This DDO requests the following change(s) to that requirement: 3. To allow the existing garage/two-story 2nd dwelling be expanded with a reduced rear yard setback of (5'-4") to the south lot line of the property, all as shown on the site and elevation plans submitted for the project. APPROVED notice sent to all affected property owners 9/22/09 |